Been doing a lot of metal work and welding
| canary dragon bawdyhouse | 05/25/18 | | Motley hyperventilating ladyboy | 05/25/18 | | canary dragon bawdyhouse | 05/25/18 | | Zippy cordovan meetinghouse cuckoldry | 05/25/18 | | canary dragon bawdyhouse | 05/25/18 | | Zippy cordovan meetinghouse cuckoldry | 05/25/18 | | canary dragon bawdyhouse | 05/25/18 | | canary dragon bawdyhouse | 06/04/18 | | Shivering 180 state | 06/04/18 | | canary dragon bawdyhouse | 06/04/18 |
Poast new message in this thread
Date: June 4th, 2018 2:40 PM Author: canary dragon bawdyhouse
I would post pictures except for doobs, but after about 30 hours of work I am done. GF came out and looked at it and she was like “that is factory level.” I even ground down the welds on the bottoms of the floor pan under the vehicle.
And no bondo.
Paint is still shit, seats are still crap, but the metal is great .... probably added enough value to have paid myself about $30 an hour.
(http://www.autoadmit.com/thread.php?thread_id=3986140&forum_id=2#36181989) |
|
|