THE George Washington School of Engineering professor weighs in on Key Bridge
| Disturbing odious depressive | 03/29/24 | | electric grizzly philosopher-king trust fund | 03/29/24 | | Disturbing odious depressive | 03/29/24 | | Haunting greedy coffee pot | 03/29/24 | | Laughsome splenetic bawdyhouse hairy legs | 03/29/24 |
Poast new message in this thread
Date: March 29th, 2024 6:19 PM Author: Disturbing odious depressive
"And Sameh Badie, an engineering professor at George Washington University, tells the news outlet the cost of rebuilding the bridge will also depend on the new design."
https://www.fox5atlanta.com/news/baltimore-bridge-rebuild-possibly-10-years
(http://www.autoadmit.com/thread.php?thread_id=5510876&forum_id=2#47537762) |
|
Date: March 29th, 2024 7:03 PM Author: Disturbing odious depressive
Realistically, the project could take five to seven years, according to Ben Schafer, an engineering professor at Johns Hopkins University.
“The lead time on air conditioning equipment right now for a home renovation is like 16 months, right?” Schafer said. He continued: “So it’s like you’re telling me they’re going to build a whole bridge in two years? I want it to be true, but I think empirically it doesn’t feel right to me.”
https://apnews.com/article/baltimore-key-bridge-collapse-rebuilding-a126a3b732af95e86d1fbef01e9fb487
(http://www.autoadmit.com/thread.php?thread_id=5510876&forum_id=2#47537891) |
|
|